How Long Does It Take to Build a Website, Software, or App in Bangladesh?
"How long will it take?" is usually the second question after price, and it deserves the same honesty. Timelines below are for a project that starts with clear requirements and a client who can review and approve drafts within a few days — not best-case marketing numbers.
Website projects
- Landing page (1 page): a few days. There's one page, one focus, and no backend to build — most of the time goes into design review, not development.
- Starter site (5–7 pages): about 1–2 weeks. Built on WordPress, so most of the schedule is content and page layout rather than custom logic.
- Business site with custom logic (up to 20 pages): roughly 3–5 weeks. Forms, calculators, or booking tools built to your workflow need their own design and testing time beyond just page layout.
- E-commerce store: about 4–6 weeks. Payment integration (bKash/Nagad/card), inventory, and order management each need to be built and tested, not just styled.
- Web application (dashboards, SaaS-style product): typically 6–10 weeks for a first version, since it's a real application with accounts, roles, and an API — not a set of pages.
Custom software projects
- Single-module tool: around 4–6 weeks, most of it spent making sure the tool actually matches how your team works day to day.
- Multi-module system (HRM, CRM, light ERP): commonly 2–4 months, because each module needs its own build and testing, then integration testing across all of them together.
- Enterprise/multi-tenant platforms: scoped per project — these regularly run 4+ months because the architecture has to be right before any module gets built on top of it.
App projects
- Single-platform app (up to 5 screens, no backend): around 3–4 weeks.
- Cross-platform app with backend (Android + iOS, auth, API, push notifications): typically 8–12 weeks.
- On-demand-style app (customer + provider + admin apps, real-time tracking, payments): 4+ months — this is really three connected apps plus a backend, not one app.
What actually adds time (beyond the build itself)
- Slow feedback. If a design or demo review sits unanswered for a week, that week is added to the project — agency speed doesn't fix client-side delay.
- Scope changes mid-build. Adding a module or a new user role partway through resets some of the already-built logic, which takes real time to adjust.
- App store review. Once an app is built, Apple's and Google's own review can add anywhere from a day to a couple of weeks — this is outside any developer's control.
- Payment gateway approval. bKash/Nagad merchant approval has its own processing time on the gateway's side, separate from development.
What speeds things up
Having your content (text, images, product data) ready before development starts, giving feedback within a day or two of each review, and settling the full feature list before the quote — rather than adding "just one more thing" mid-build — are the three biggest factors in hitting a timeline. See our packages and what's included in each on the Pricing page, or get a quote with your specific scope for a realistic date, not a guess.